GARD’s alternatives

  • to provide a secure and sustainable system that is resilient to future population increases, climate change and possible prolonged drought.
  • the Abingdon Reservoir proposals are not justified.

Leakage

Thames Water has an appalling leakage rate – every day its pipes leak more than twice the water supplied by the proposed reservoir, over 550 million litres per day! About 25% of the water put into its pipes is leaked. This is the worst in the UK, and about 3-5 times the leakage rate in Germany, Denmark and Holland.

Reduce demand

Thames Water’s household usage is higher than in 18 EU countries and more or less the worst in England. If Thames Water managed to half its leakage rate by 2050 and make improvements in water efficiency, government figures show this is enough to meet our water needs, even taking into account Thames Water’s grossly inflated population figures and overstated demands. Fixing leakage and using water efficiently are the best solutions.

Water Transfer

GARD’s experts propose:

A map of the 2 possible routes for the Severn Trent Transfer
  • starting Phase 1  from 2027. This pipeline on its own would supply 50% of the proposed reservoir’s supply, for less than 50% of the cost. It could be delivered in 5 years, a much shorter timeframe than the 12 year reservoir build.
    • If needed, the STT could be upgraded via support from Midlands recycling plants and North Wales reservoirs.
    • The SST is an adaptive solution, with cost to the billpayer only if and when needed.
    • The pipeline would leave no trace, similar to the gas pipelines laid for the national grid. There would be lower permanent loss of land and biodiversity.
    • The STT has been studied since the 1990s. The River Severn’s flow is much higher than the River Thames and less prone to drought. 
    • GARD’s  modelling shows that the STT  is more drought resilient than the proposed reservoir.
  • advancing the Grand Union Canal (GUC) Phase 2 scheme to start immediately on completion of Phase 1 in 2031 to be ready by 2036, rather than 2040.

Re-use water and build desalination plants

To deliver a sustainable water supply, there are two clear options: